Delivery answer

How long does installation take, and how is warranty confirmed?

Installation flowWarranty boundaryShop cooperation

Pre-installation review

Before installation, Xuntou reviews model year, glass structure, size, curve, power routing, control position, installation environment, and delivery shop readiness.

01Vehicle and glass structure
02Controls and power routing
03Shop and installation conditions

Delivery timing

Timing depends on product availability, vehicle complexity, shop schedule, and inspection requirements. First-time fitment usually needs more review time.

01Product availability
02Shop schedule
03Post-installation inspection

Warranty confirmation

Warranty should be confirmed together with product scope, installation scope, control components, usage conditions, and delivery records.

01Order and vehicle information
02Installation inspection records
03Product and labor boundary

Channel cooperation

For shops and channels, stable delivery requires shared vehicle fitment language, product scope, installation records, and after-sales feedback loops.

01Shared vehicle fitment scope
02BOM/product catalog alignment
03After-sales feedback records

Installation FAQ

Common questions about installation and warranty

These answers turn delivery questions into confirmable information.

Can installation always be finished the same day?

No universal promise should be made. Timing depends on vehicle structure, product availability, shop schedule, control method, and inspection requirements.

Is warranty only about the product itself?

Warranty should be considered together with product, installation, controls, usage, and delivery records. Keep order, vehicle, installation, and inspection records.

What matters most before shop cooperation?

Confirm fitment scope, product series, installation conditions, inspection method, and after-sales feedback workflow before relying on verbal promises.

Next: turn the question into a fitment review

Share the model, model year, city, roof or side-window position, and main concern so Xuntou can assess the boundary before recommending a plan.